A procurement schedule, planned backwards
The install date is the fixed point. Everything else is scheduled back from it.
Wanda · October 15, 2026

Field notes
Why install dates slip, and how we stop it
A missed install is almost never one big failure. It is a dozen small gaps between the spec and the site.
Wanda · October 15, 2026